Anyox Diversion Dam

The Anyox Diversion Dam sits on Anyox Creek in a remote coastal valley of British Columbia, about 145 kilometres north of Prince Rupert via Observatory Inlet. Designed by concrete pioneer and dam engineer John S.

Eastwood, the structure was built in 1924 to supply hydroelectric power to a copper mine, smelter, and the company town of Anyox. At 44 metres high and 207 metres long, it was for many years the tallest dam in Canada.

The dam's distinctive design features 26 protruding arches resting on 27 independent buttresses — a multiple-arch configuration that minimized the amount of concrete required to build such a large structure in such an isolated location.

Construction relied on hauling concrete bags up a single-gauge electric railway. The mine and smelter closed during the Great Depression, and the dam was abandoned in 1935. Today water passes through small outlets and a dynamite-blasted opening.

The site is accessible only by boat, floatplane, or helicopter.


Nearby points of interest

Find excellent paddling spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Anyox Diversion Dam before you go paddling.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top paddling waters

No waters available right now.

Explore near Anyox Diversion Dam

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.