Upper Bonnington Dam is a concrete gravity dam on the Kootenay River, located approximately 17 kilometres downstream of Nelson in the Regional District of Central Kootenay, British Columbia.

Construction was completed in 1907, making it the second dam built on the Kootenay River, erected to meet the growing energy demands of the region's mining industry. The dam is part of the Upper Bonnington Generating Plant, owned and operated by FortisBC.

The facility includes six hydroelectric units housed in two adjacent powerhouses, a gated spillway, and an overflow spillway. The 15-metre-high dam has a total rated capacity of 65 megawatts, achieved through upgrades in 1916 and a further extension in 1939.

In 2018, Hydro Review inducted the plant into its Hydro Hall of Fame in recognition of its extraordinary longevity and contribution to hydroelectric power generation.


Nearby points of interest

Find excellent paddling spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Upper Bonnington Dam before you go paddling.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top paddling waters

No waters available right now.

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.