RouteClass II
- Distance
- 6.7 mi
- Paddle time
- ~2 hrs
- Best for
- Kayak
- Put-in → take-out
- Ground Squirrel Bridge Boat Ramp → Patrick Henry Boat Ramp
Curated by PaddleWays
9.2 mi whitewater route on the South Anna River in Virginia
Level right now
Route facts
Ashland Mills dam at Route 1
About this route
This 9.2-mile section of the South Anna River offers a varied paddling experience. The trip begins at the Route 54 bridge and passes several notable landmarks.
About 2 miles downstream, you'll pass under the Route 686 Horseshoe Bend Road bridge, which can serve as an alternative takeout for a shorter trip. Continuing on, you'll pass Route 667 Blunts Bridge Road at mile 6, though there's no obvious access point here.
The last two miles consist of calm backwaters created by the 20-foot Ashland Mills dam at Route 1.
Put-in and take-out
Put-in
Take-out
Hazards
No paddler has reported a hazard here yet, so these are the dams, falls and big rapids on our map. Hazards change with flows and storms, so check them before you launch.
From the community
Nobody has shared a trip on Route 54 to Route 1 yet. Paddle it, then tell the next paddler how it went.
The gauges near Route 54 to Route 1 and the forecast where it starts, so you can pick your day.
No forecast data available.
Same water
The other curated routes on the South Anna River, each with how it is running now.
RouteClass II
Close by
Curated routes on other waters within an hour or so, nearest first.
PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.