RouteClass I–II
- Distance
- 7.4 mi
- Paddle time
- ~2.5 hrs
- Best for
- Beginners, families
- Put-in → take-out
- Meyerstown Boat Ramp → Moulton Park Boat Ramp
Curated by PaddleWays
2.8 mi flatwater route on the Shenandoah River in West Virginia
Level right now
Recommended level from American Whitewater, on the gauge at Millville.
Route facts
Take-out at Millville Dam requires portage
About this route
This section of the Shenandoah River offers a 2.8-mile mix of flatwater and rapids. The run begins at the Bloomery Bridge WVDOH Boat Ramp, located on river right upstream of the bridge on Wilt Road.
A notable rapid on this stretch is Lost Rapid, also known as Big Eddy, which is rated as Class II. This section can be combined with the VA 7 to Bloomery Bridge run for a longer trip.
The take-out at Millville Dam requires a portage, with a secured portage trail available.
Put-in and take-out
Put-in
Take-out
Hazards
No paddler has reported a hazard here yet, so these are the dams, falls and big rapids on our map. Hazards change with flows and storms, so check them before you launch.
From the community
Nobody has shared a trip on this route yet. Paddle it, then tell the next paddler how it went.
The gauges near this route and the forecast where it starts, so you can pick your day.
No forecast data available.
Same water
The other curated routes on the Shenandoah River, each with how it is running now.
Close by
Curated routes on other waters within an hour or so, nearest first.
PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.