Skip to main content

Curated by PaddleWays

Red Covered Bridge to County Road 1150

13 mi flatwater route on Big Bureau Creek in Illinois

  • Flatwater · Class I–II

Map of the Red Covered Bridge to County Road 1150 route, from Red Covered Bridge Park to County Road 1150
  • Route
  • Put-in
  • Take-out

Level right now

How Red Covered Bridge to County Road 1150 is running today

Recommended level from the route description.

Route facts

Red Covered Bridge to County Road 1150 at a glance

Distance
13 mi
Paddle time
~4.5 hrs
Type
Flatwater · Class I–II
Recommended level
350 cfs or morefrom the route description

Bigger waves after Hennepin Canal siphon

About this route

Paddling this route

This 13-mile section of Big Bureau Creek is a bucket list-worthy paddle through northern Illinois that offers excellent variety through heavily wooded terrain and open farmlands.

The run is characterized by swift, riffly water throughout, with a gradient of approximately 5.5 feet per mile that keeps things interesting from start to finish.

You'll launch from the historic Red Covered Bridge Park, where the 1863 covered bridge—listed on the National Register of Historic Places and once part of the Peoria Galena Trail—spans the creek just north of Interstate 80.

The creek features numerous tall sand and clay banks that are the hallmark of this run, alternating between low-banked agricultural environs and occasional woodsy passages. Mini islands and gravel bars pop up occasionally.

Notable features include bigger waves just after the Hennepin Canal siphon that may require portaging for less experienced paddlers, and the all-wood Captain Swift Bridge (another covered bridge).

Recommended minimum flow is 350 cfs, with ideal levels at 450 cfs or higher. The put-in park is a small roadside wayside with decent parking but no facilities. This section can be broken into shorter segments at Highway 80 or Highway 34 (see notes below).

Put-in and take-out

  • Put-in

    Red Covered Bridge Park

  • Take-out

    County Road 1150

Hazards

Hazards on this route

No hazards are marked on this route yet. That is not the same as none being there: if you find one, report it for the next paddler.

From the community

Trip reports on this route

Nobody has shared a trip on this route yet. Paddle it, then tell the next paddler how it went.

Flows & weather (10 day forecast)

The gauges near this route and the forecast where it starts, so you can pick your day.

No forecast data available.

Same water

More routes on Big Bureau Creek

The other curated routes on Big Bureau Creek, each with how it is running now.

Curated by PaddleWays

RouteClass I–III

Distance
3 mi
Paddle time
~1 hr
Put-in → take-out
Highway 80 twin bridges → Highway 34
Curated by PaddleWays

RouteClass I–II

Distance
4.6 mi
Paddle time
~1.5 hrs
Put-in → take-out
Red Covered Bridge Park → Highway 80

Close by

Routes near this one

Curated routes on other waters within an hour or so, nearest first.

Curated by PaddleWays

RouteFlatwater

Distance
4 mi
Paddle time
~1.5 hrs
Put-in & take-out
Hennepin Canal Boat Ramp
Curated by PaddleWays

RouteClass II

Distance
28.7 mi
Paddle time
~9.5 hrs
Put-in → take-out
South Streator Access → Oglesby Boat Ramp
Dam past wildcat rapids requires portage
Curated by PaddleWays

RouteFlatwater

Distance
4.1 mi
Paddle time
~1.5 hrs
Put-in → take-out
Skare Park

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.