RouteClass II
- Distance
- 7.7 mi
- Paddle time
- ~2.5 hrs
- Put-in → take-out
- Corbett Dam Boat Ramp → Willwood Dam Take Out Boat Ramp
Curated by PaddleWays
8.1 mi whitewater route on the Shoshone River in Wyoming
Level right now
Route facts
Class V rapid on the run
About this route
The Buffalo Bill Dam to Highway 120 bridge section of the Shoshone River is a challenging and scenic whitewater run in Park County, Wyoming.
This 8.1-mile stretch offers a variety of rapids ranging from class II to class V, making it suitable for experienced paddlers. The run begins at Buffalo Bill Dam, where paddlers can walk towards the dam and choose a comfortable spot to launch.
There's a mix of class II-IV rapids throughout the run. Paddlers have the option to take out at Hayden Arch bridge for a shorter trip or continue to the Highway 120 bridge for the full run.
Put-in and take-out
Put-in
Take-out
Hazards
No hazards are marked on this route yet. That is not the same as none being there: if you find one, report it for the next paddler.
From the community
Nobody has shared a trip on this route yet. Paddle it, then tell the next paddler how it went.
The gauges near this route and the forecast where it starts, so you can pick your day.
No forecast data available.
Same water
The other curated routes on the Shoshone River, each with how it is running now.
Close by
Curated routes on other waters within an hour or so, nearest first.
PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.