RouteClass II–III
- Distance
- 4.5 mi
- Paddle time
- 2 hrs
- Best for
- Intermediate paddlers
- Put-in → take-out
- High Bank Boat Ramp → Byrd's Access
Curated by PaddleWays
3.6 mi flatwater route on the Mulberry River in Arkansas
Level right now
Recommended level from American Whitewater, on the gauge at Mulberry.
Route facts
About this route
The Redding to Turner Bend section of the Mulberry River offers paddlers a scenic and exciting 3.6-mile journey through the Arkansas wilderness. This stretch features steady action with Class I to Class II rapids, making it suitable for intermediate paddlers.
The put-in is at Redding Campground, located 2.7 miles downstream from Low Water Bridge. As you make your way downstream, you'll encounter one of the river's best rapids, Hamm Falls, about half a mile before reaching the take-out at Turner Bend.
This section can be easily combined with upstream sections for a longer trip, or used as a shorter, more manageable float for those with less time or experience.
Put-in and take-out
Put-in
Take-out
Hazards
No hazards are marked on Redding to Turner Bend yet. That is not the same as none being there: if you find one, report it for the next paddler.
From the community
Nobody has shared a trip on Redding to Turner Bend yet. Paddle it, then tell the next paddler how it went.
The gauges near Redding to Turner Bend and the forecast where it starts, so you can pick your day.
No forecast data available.
Same water
The other curated routes on the Mulberry River, each with how it is running now.
Close by
Curated routes on other waters within an hour or so, nearest first.
PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.