RouteFlatwater
- Distance
- 9.9 mi
- Paddle time
- ~3.5 hrs
- Put-in → take-out
- S O'riley Road Carry-in → Sweet Allyn Park Canoe Launch
Curated by PaddleWays
5 mi flatwater route on Turtle Creek in Wisconsin
Level right now
Recommended level from American Whitewater, on the gauge at Carvers Rock Road.
Route facts
About this route
This stretch of Turtle Creek is considered one of the prettiest parts of the creek, offering paddlers a beautiful and enjoyable experience. The run begins at the Highway 140 bridge and continues downstream to Tiffany Bridge, a notable landmark on the creek.
Along the way, paddlers will encounter a mix of natural scenery and occasional glimpses of rural Wisconsin. This section can be extended to Sweet-Allyn Park for a longer trip of approximately 6.4 miles total.
Put-in and take-out
Put-in
Take-out
Hazards
No hazards are marked on Highway 140 to Tiffany Bridge yet. That is not the same as none being there: if you find one, report it for the next paddler.
From the community
Nobody has shared a trip on Highway 140 to Tiffany Bridge yet. Paddle it, then tell the next paddler how it went.
The gauges near Highway 140 to Tiffany Bridge and the forecast where it starts, so you can pick your day.
No forecast data available.
Same water
The other curated routes on Turtle Creek, each with how it is running now.
Close by
Curated routes on other waters within an hour or so, nearest first.
PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.