Skip to main content

Elko Dam

Elko Dam is a run-of-the-river concrete diversion dam on the Elk River in the southeast corner of British Columbia, roughly 60 km southeast of Cranbrook and 25 km south of Fernie.

Built by the East Kootenay Power Company and completed in 1924–25, the structure stands 16 metres tall and 66 metres long, designed to pass high spring runoff over its crest. It was acquired by BC Hydro in 1968 and remains in active operation.

The adjacent generating station houses two vertical-axis Francis turbines with a combined output of 12 MW, originally supplying power to the Sullivan Mine in Kimberley and the towns of Fernie, Cranbrook, and Kimberley.

The dam sits approximately 16 kilometres upriver from the Elk's confluence with Lake Koocanusa, and a gauging station below the dam diversion monitors real-time streamflow for the river.

The dam serves as a key reference point for paddlers and anglers, marking an important take-out location on the Elk River.


Nearby points of interest

Find excellent paddling spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Elko Dam before you go paddling.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top paddling waters

No waters available right now.

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.