Skip to main content

Puntledge River Diversion Dam

The Puntledge River Diversion Dam is a BC Hydro facility located 12.9 kilometres upstream from the river's estuary, roughly 3.7 kilometres downstream of the Comox Lake impoundment dam.

Built as part of a hydroelectric system first developed in 1912 and substantially redeveloped between 1953 and 1956, the diversion dam channels water into an overland penstock that carries flow approximately five kilometres to a powerhouse on the lower Puntledge River.

Because the Puntledge supports both summer- and fall-run Chinook salmon, the dam is equipped with a fishway to facilitate upstream passage.

Studies have assessed fish access through this fishway across varying lake levels and flow conditions throughout the migration season.

The surrounding area offers a viewpoint and picnic site with interpretive signage explaining the region's hydroelectric history, and serves as a trailhead connecting to the River Trails and Bevan Trail systems.


Nearby points of interest

Find excellent paddling spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Puntledge River Diversion Dam before you go paddling.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top paddling waters

No waters available right now.

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.