Skip to main content

Curated by PaddleWays

Highway 161 to 1st Street Bridge

1 mi flatwater route on the Tomorrow River in Wisconsin

  • Flatwater · Class I

Map of the Highway 161 to 1st Street Bridge   route, from Highway 161 (Loberg Road) to 1st Street Bridge near Nelsonville Mill
  • Route
  • Put-in
  • Take-out

Level right now

How Highway 161 to 1st Street Bridge is running today

Route facts

Highway 161 to 1st Street Bridge at a glance

Distance
1 mi
Paddle time
~0.5 hrs
Type
Flatwater · Class I

About this route

Paddling this route

This 1.0-mile stretch of the Tomorrow River is a great trip that showcases the river's characteristic clear water and attractive gravel bottom. While the Tomorrow is more of an oversized creek than a river, it offers a pleasant paddle through this section.

The put-in at Highway 161 (also known as Loberg Road) features a nice natural trail leading down to the landing, though the landing itself is steep - you'll need to either slide your boat in or wade in.

The river bottom is attractively graveled, and you'll pass a nice landmark along the way. The take-out at 1st Street Bridge near Nelsonville Mill is particularly noteworthy.

This location features the historic Rising Star Mill, a big red grain mill by the river with a very nice grassy landing. While the historic grain mill is no longer functional, it serves as a venue for local community events and concerts.

The take-out area offers good parking and an outhouse, making it a convenient and popular access point. This short section provides an excellent introduction to the Tomorrow River's appeal.

While the river is pretty narrow between Highway 161 and Nelsonville, it's not that bad - a 12.5' boat handles it just fine, and even a 14' boat would be able to run this section with little problems.

Put-in and take-out

  • Put-in

    Highway 161 (Loberg Road)

  • Take-out

    1st Street Bridge near Nelsonville Mill

Hazards

Hazards on this route

No hazards are marked on this route yet. That is not the same as none being there: if you find one, report it for the next paddler.

From the community

Trip reports on this route

Nobody has shared a trip on this route yet. Paddle it, then tell the next paddler how it went.

Flows & weather (10 day forecast)

The gauges near this route and the forecast where it starts, so you can pick your day.

No forecast data available.

Same water

More routes on the Tomorrow River

The other curated routes on the Tomorrow River, each with how it is running now.

Curated by PaddleWays

RouteClass I

Distance
1.1 mi
Paddle time
~0.5 hrs
Put-in → take-out
Highway Q/Rolling Hills Road → Highway 161 (Loberg Road)
Launch at Highway 161 sits 2 feet above zippy current
Curated by PaddleWays

RouteClass I–II

Distance
3.9 mi
Paddle time
~1.5 hrs
Put-in → take-out
Highway T → Amherst Millpond Boat Ramp
Boulder gardens and rapids near take-out
Curated by PaddleWays

RouteClass I–II

Distance
4.9 mi
Paddle time
3.3 hrs
Put-in → take-out
Highway 161 (Loberg Road) → Amherst Millpond Boat Ramp

Close by

Routes near this one

Curated routes on other waters within an hour or so, nearest first.

Curated by PaddleWays

RouteClass II–III

Distance
5 mi
Paddle time
~1.5 hrs
Best for
Intermediate paddlers
Put-in → take-out
Mill Street in Amherst → Otto Road
Curated by PaddleWays

RouteClass I–II

Distance
13.4 mi
Paddle time
~4.5 hrs
Put-in → take-out
Shantytown Road → Jordan Park Boat Ramp
Bumpy boulder garden past Plover River Road bridge
Curated by PaddleWays

RouteClass I–II

Distance
12.8 mi
Paddle time
~4.5 hrs
Best for
Intermediate paddlers
Put-in → take-out
Wolf River Road → Big Falls Pond Boat Ramp
Big Falls dam at the end

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.