Kwoiek Creek Diversion Dam
The Kwoiek Creek Diversion Dam is a water intake and diversion structure that forms the upstream component of the 49.9 MW Kwoiek Creek run-of-river hydroelectric project, located approximately 8 km upstream of the mouth of Kwoiek Creek, a tributary of the Fraser River about 14 km south of Lytton, British Columbia.
At this site, a Coanda intake screen diverts a portion of Kwoiek Creek's flow — up to 13.5 cubic metres per second — into a 7.2 km buried steel penstock.
The penstock descends under a gross head of roughly 564 metres before reaching a powerhouse on Kanaka Bar Indian Band reserve lands, where electricity is generated before water is returned to the creek near its confluence with the Fraser River.
The project, commissioned in 2013, is a joint venture between Innergex Renewable Energy and the Kanaka Bar Indian Band.
Nearby points of interest
Find excellent paddling spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.
Water and weather conditions (10 day forecast)
Check the forecast at Kwoiek Creek Diversion Dam before you go paddling.
No forecast data available.
Paddling near Kwoiek Creek Diversion Dam
Bc licenses and regulations
No licenses or regulations available for Bc.
Explore near Kwoiek Creek Diversion Dam
Smarter Paddling Starts in the App.
PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.