Skip to main content

Terzaghi Dam

Terzaghi Dam is the key diversion structure in BC Hydro's Bridge River Power Project, sitting at the eastern end of Carpenter Lake approximately 20–30 km west of Lillooet.

Construction began in 1955 and was completed in 1960, impounding roughly 23,725 cubic metres of water at an elevation of 651 metres. The earthfill and rockfill dam stands 55 metres tall and stretches more than 360 metres in length.

Originally called Mission Dam, it was renamed in 1965 to honour Karl von Terzaghi, the civil engineer who founded the science of soil mechanics and served as chief consultant for the dam's design.

Water stored in the Carpenter Lake reservoir is conveyed through tunnels and steel penstocks to a powerhouse on Seton Lake, roughly 410 metres below. A gravel road crosses the dam's crest, offering sweeping views of the lake and surrounding valley.

The structure is visible from a considerable distance and is considered one of Terzaghi's most technically challenging projects.


Nearby points of interest

Find excellent paddling spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Terzaghi Dam before you go paddling.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top paddling waters

No waters available right now.

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.