Tretheway Creek Dam
The Tretheway Creek Dam is the intake weir and diversion structure at the heart of a run-of-river hydroelectric facility located on Crown land approximately 50 kilometres north of Harrison Hot Springs, British Columbia.
Built between 2013 and 2015, the weir creates a small headpond from which a regulated flow is diverted into a 4.6-kilometre penstock that drops water roughly 263 metres to a powerhouse below.
A fish ladder is incorporated into the intake structure to allow fish migration through the site.
The facility, owned and operated by Innergex Renewable Energy, has an installed capacity of 21.2 MW and produces an average of 81,000 MWh annually under a 40-year power purchase agreement with BC Hydro.
It sits within the traditional territories of the Douglas First Nation and Sts'ailes, both of which reached revenue-sharing agreements with the provincial government in 2015.
Nearby points of interest
Find excellent paddling spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.
Water and weather conditions (10 day forecast)
Check the forecast at Tretheway Creek Dam before you go paddling.
No forecast data available.
Paddling near Tretheway Creek Dam
Bc licenses and regulations
No licenses or regulations available for Bc.
Explore near Tretheway Creek Dam
Smarter Paddling Starts in the App.
PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.










