Skip to main content

Upper Mamquam Hydro

Upper Mamquam Hydro is a run-of-river hydroelectric facility on the Mamquam River near Squamish, British Columbia, about an hour north of Vancouver.

The plant came online commercially in 2005 and generates 25 MW of capacity, producing an average of roughly 103,000 megawatt-hours per year under a long-term contract with BC Hydro.

Water is diverted from the river into a conveyance system that includes a low-pressure penstock, a lined tunnel section, and a high-pressure penstock leading down to the powerhouse.

The powerhouse, sited at the end of the river canyon to minimize fish habitat impact, contains two horizontal-axis Francis turbine generator units. Power is transmitted at 69 kV approximately 7.8 km to connect to the provincial grid in Squamish.

The facility is currently owned and operated by TransAlta.


Water and weather conditions (10 day forecast)

Check the forecast at Upper Mamquam Hydro before you go paddling.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top paddling waters

No waters available right now.

Smarter Paddling Starts in the App.

PaddleWays gives you everything you need to plan smarter, paddle better, and own every trip from first launch to takeout.